This means that the contractors, builders, workers, and supervisors will have the details of all the components beforehand. Once approved, the shop drawings are referred to the most number of times while the construction of the project is underway.Needed for coordination within the construction team. These drawings need the consent and approval of the construction team.Personify the true imagery of the construction project.More importantly, the shop drawings are made before the start of a construction project. Shop drawings are the detailed versions of these components and help identify how they will fit into the building structure. All of these components have their distinct specifications and measurements. Structural Precast Modeling and DetailingĮvery building comprises a set of components.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |